We casted the columns of the ground floor and we building walls by blocks. The construction works at this stage has taken 3 weeks, from casting RCC 33 Footings. Casting 33 sub columns. Casting the plinth of 178 meters as perimeter, and elevating block walls up to 2.85 meters height.
Trust Barcos Construction because, we have courageous works who works very faster by valuing your investment.










Leave a Reply