  • Barcos started the excavation of footing foundation Jabana Site

    On 20th November 2024 We started the excavation of footing foundation Jabana Site After 4 days the excavation of all footings was completed. We started formworks and steel works for the footings then we placed them in their respective footing pit, we requested the inspection from the city of Kigali, the inspection was fast and…

    Read More: Barcos started the excavation of footing foundation Jabana Site
  • BARCOS -RWABUTENGE construction site

    On GAHANGA, RWABUTENGE construction site, we have finished the formwork, steel works, and concrete casting of the first floor. At this stage every step was done strongly do that we have no any failure during the concreting casting. We selected the best sand (Kayumbu), the best aggregates and good cement of 42.5 N/mm2 and fresh…

    Read More: BARCOS -RWABUTENGE construction site